Unimark EC3000 Series Spécifications

Naviguer en ligne ou télécharger Spécifications pour Lecteurs de codes-barres Unimark EC3000 Series. Unimark EC3000 Series Specifications Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 278
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
AIMS System and Services Agreement Page 1 of 60
SYSTEM AND SERVICES AGREEMENT
between
BROWARD COUNTY
and
AIR-TRANSPORT IT SERVICES, INC.
RFP No. 20070514-0-AV-01
This is a SYSTEM AND SERVICES AGREEMENT ("System Agreement"), made
and entered into by and between BROWARD COUNTY, a political subdivision of the
State of Florida, hereinafter referred to as "County,"
and
AIR-TRANSPORT IT SERVICES, INC., a Delaware corporation, authorized to do
business in the State of Florida, hereinafter referred to as "Contractor,"
WHEREAS, this System and Services Agreement ("System Agreement") and
the concurrent Software License and Maintenance Agreement ("License Agreement")
are the result of County’s Request for Proposal (RFP) process designated as Airport
Information Management System, RFP No. 20070514-0-AV-0, including all addenda
thereto; and
WHEREAS, Contractor has represented that it has application Software that
when used with other third party products and/or Goods provided by Contractor, as
identified in the Agreement, will provide County with an Airport Information Management
System. Contractor’s Software and the third party products and other Deliverables make
up the System, as defined below, and Contractor represents that its personnel or those
subcontracted by Contractor have the knowledge, proficiency and skills to provide (a)
the Services, including any programming/configuration Services needed to modify the
Licensed Software and/or establish interfaces between the Licensed Software and other
County entities, data processing programs and Software applications as may be
hereinafter described, (b) consulting and project management Services, (c) data
conversion, (d) training, mentoring and Documentation, (e) infrastructure and millwork
installation and (f) maintenance of the System, including, but without limitation, those
parts of the System not procured from and/or owned by Contractor; however, those
parts not procured from and/or owned by Contractor shall meet or exceed Contractor
recommendations/ specifications; and
WHEREAS, the parties understand that County may be directly acquiring from
other vendors Hardware, Software, and other items needed to configure, install and
otherwise establish the proper data processing environment needed by Contractor in
order for Contractor to furnish and provide the System; and
Exhibit 3
Page 1 of 278
Vue de la page 0
1 2 3 4 5 6 ... 277 278

Résumé du contenu

Page 1 - Page 1 of 278

AIMS System and Services Agreement Page 1 of 60 SYSTEM AND SERVICES AGREEMENT between BROW

Page 2 - Page 2 of 278

AIMS System and Services Agreement Page 10 of 60 2.45 Work Authorization: means a wr

Page 3 - Page 3 of 278

AIMS Attachment A: AIMS Statement of Work Page 40 of 130 copies of documented quality control operations, inspections and tests shall

Page 4 - Page 4 of 278

AIMS Attachment A: AIMS Statement of Work Page 41 of 130 2. Remove pavement stains and other foreign deposits. B. CONTRACTOR shall clean a

Page 5 - Page 5 of 278

AIMS Attachment A: AIMS Statement of Work Page 42 of 130 CONTRACTOR shall provide scaled drawings of modifications and give particular atten

Page 6 - Page 6 of 278

AIMS Attachment A: AIMS Statement of Work Page 43 of 130 3 TECHNICAL REQUIREMENTS 3.1 TECHNICAL OVERVIEW 3.1.1 Integration Requirements A.

Page 7 - Page 7 of 278

AIMS Attachment A: AIMS Statement of Work Page 44 of 130 3. When conflicts arise, County Project Manager shall have the final determi

Page 8 - Page 8 of 278

AIMS Attachment A: AIMS Statement of Work Page 45 of 130 12. Part 1193 of the Telecommunications Act Accessibility Guidelines: i www.access-bo

Page 9 - Page 9 of 278

AIMS Attachment A: AIMS Statement of Work Page 46 of 130 4. Acceptance of existing conditions statement: Provide written documentation

Page 10 - Page 10 of 278

AIMS Attachment A: AIMS Statement of Work Page 47 of 130 drawing format approved by the County and shall detail system component inte

Page 11 - Page 11 of 278

AIMS Attachment A: AIMS Statement of Work Page 48 of 130 County. Repairs are to be made as expeditiously as possible. If parts are immediatel

Page 12 - Page 12 of 278

AIMS Attachment A: AIMS Statement of Work Page 49 of 130 ring or spiral binders with a table of contents and a tab for each section or division

Page 13 - Page 13 of 278

AIMS System and Services Agreement Page 11 of 60 Agreement. In the event of non-acceptanc

Page 14 - Page 14 of 278

AIMS Attachment A: AIMS Statement of Work Page 50 of 130 diagrams. This documentation shall be provided for each of the individual AIMS includ

Page 15 - Page 15 of 278

AIMS Attachment A: AIMS Statement of Work Page 51 of 130 2. Includes the ability to receive data both digitally from other systems a

Page 16 - Page 16 of 278

AIMS Attachment A: AIMS Statement of Work Page 52 of 130 to be supported shall be no less than a minimum of two times the amount of initially p

Page 17 - Page 17 of 278

AIMS Attachment A: AIMS Statement of Work Page 53 of 130 principle role of the AODB is to be the primary holder of all data that

Page 18 - Page 18 of 278

AIMS Attachment A: AIMS Statement of Work Page 54 of 130 L. For each and every interface to the AODB, the CONTRACTOR shall be responsible for

Page 19 - Page 19 of 278

AIMS Attachment A: AIMS Statement of Work Page 55 of 130 3.4 ELECTRONIC VIDEO INFORMATION DISPLAY SYSTEM (EVIDS) - The Contractor shall

Page 20 - Page 20 of 278

AIMS Attachment A: AIMS Statement of Work Page 56 of 130 I. EVIDS flight information shall be integrated with the Airport‟s web site to pro

Page 21 - Page 21 of 278

AIMS Attachment A: AIMS Statement of Work Page 57 of 130 E. The CONTRACTOR shall provide an interface to each airline host system to provide f

Page 22 - Page 22 of 278

AIMS Attachment A: AIMS Statement of Work Page 58 of 130 G. The EVIDS shall fully support the storage, display, and manipulation of informa

Page 23 - Page 23 of 278

AIMS Attachment A: AIMS Statement of Work Page 59 of 130 3. Colors shall be able to be assigned based on field content. For examp

Page 24 - Page 24 of 278

AIMS System and Services Agreement Page 12 of 60 ARTICLE 6 COMPENSATION AND METHOD OF PAYM

Page 25 - Page 25 of 278

AIMS Attachment A: AIMS Statement of Work Page 60 of 130 These parameters or triggers include but are not limited to the items below

Page 26 - Page 26 of 278

AIMS Attachment A: AIMS Statement of Work Page 61 of 130 4. Override of Automatic Status Updates: The authorized EVIDS user shall have

Page 27 - Page 27 of 278

AIMS Attachment A: AIMS Statement of Work Page 62 of 130 the ability to change the free-text message displayed. The system input de

Page 28 - Page 28 of 278

AIMS Attachment A: AIMS Statement of Work Page 63 of 130 manner as it would be seen on a monitor or other display device, using live data from

Page 29 - Page 29 of 278

AIMS Attachment A: AIMS Statement of Work Page 64 of 130 D. When operating in dynamic mode, the timing window shall automatically adjust based

Page 30 - Page 30 of 278

AIMS Attachment A: AIMS Statement of Work Page 65 of 130 selected video files. This capability shall be integrated with the scheduling

Page 31 - Page 31 of 278

AIMS Attachment A: AIMS Statement of Work Page 66 of 130 2. Additionally, upon such a failure, the system administrator shall receive a warnin

Page 32 - Page 32 of 278

AIMS Attachment A: AIMS Statement of Work Page 67 of 130 3.4.10 EVIDS Hardware Requirements A. In addition to the requirements specified herei

Page 33 - Page 33 of 278

AIMS Attachment A: AIMS Statement of Work Page 68 of 130 2. The RMS and DAPP shall provide the ability to block any user from the utilization

Page 34 - Page 34 of 278

AIMS Attachment A: AIMS Statement of Work Page 69 of 130 workstation on an airline by airline basis. Access to the airline interface shall be

Page 35 - Page 35 of 278

AIMS System and Services Agreement Page 13 of 60 Nine Thousand Dollars ($459,000.00) f

Page 36 - Page 36 of 278

AIMS Attachment A: AIMS Statement of Work Page 70 of 130 12. Baggage Sorting/Reconciliation System 13. E-mail. M. The DAPP shall support an

Page 37 - Page 37 of 278

AIMS Attachment A: AIMS Statement of Work Page 71 of 130 8. Avianca 9. Bahamas Air 10. CanJet 11. Caribbean 12. Chalks (commuter) 13. Comair

Page 38 - Page 38 of 278

AIMS Attachment A: AIMS Statement of Work Page 72 of 130 3.5.5 CONTRACTOR Responsibility A. The CONTRACTOR shall be responsible for performin

Page 39 - Page 39 of 278

AIMS Attachment A: AIMS Statement of Work Page 73 of 130 E. The pricing breakout for the following components is included in the Con

Page 40 - Page 40 of 278

AIMS Attachment A: AIMS Statement of Work Page 74 of 130 3.6.3 CUSS PERFORMANCE REQUIREMENTS A. The time from when an airline is selected fo

Page 41 - Page 41 of 278

AIMS Attachment A: AIMS Statement of Work Page 75 of 130 3.7 LOCAL DEPARTURE CONTROL SYSTEM (LDCS) - The Contractor shall comply with the req

Page 42 - Page 42 of 278

AIMS Attachment A: AIMS Statement of Work Page 76 of 130 E. The LDCS implementation includes a minimum of ten (10) airlines. A per additional

Page 43 - Page 43 of 278

AIMS Attachment A: AIMS Statement of Work Page 77 of 130 10. Ability to handle charter and domestic flights 11. Issue (and cancel) bag tags

Page 44 - Page 44 of 278

AIMS Attachment A: AIMS Statement of Work Page 78 of 130 B. The Resource Management System (RMS) shall include the following software

Page 45 - Page 45 of 278

AIMS Attachment A: AIMS Statement of Work Page 79 of 130 provide BCAD with a recommended assignment schedule. The system shall also include t

Page 46 - Page 46 of 278

AIMS System and Services Agreement Page 14 of 60 days after Final Acceptance. Invoices sh

Page 47 - Page 47 of 278

AIMS Attachment A: AIMS Statement of Work Page 80 of 130 B. Ticket Module: The RMS shall have an expandable module for planning / scheduling

Page 48 - Page 48 of 278

AIMS Attachment A: AIMS Statement of Work Page 81 of 130 1. The Bag Breakdown Module shall provide an integrated planning function and

Page 49 - Page 49 of 278

AIMS Attachment A: AIMS Statement of Work Page 82 of 130 4. The software shall support the ability to store and work with multiple scheduling

Page 50 - Page 50 of 278

AIMS Attachment A: AIMS Statement of Work Page 83 of 130 G. Modes: The RMS shall provide the following modes of control for both planning an

Page 51 - Page 51 of 278

AIMS Attachment A: AIMS Statement of Work Page 84 of 130 assignment (depending on the mode of operation). The warnings, recommendatio

Page 52 - Page 52 of 278

AIMS Attachment A: AIMS Statement of Work Page 85 of 130 D. Hard and soft rules shall be definable. The ability to weight rules (e.g., import

Page 53 - Page 53 of 278

AIMS Attachment A: AIMS Statement of Work Page 86 of 130 D. When modifications are performed to certain areas of data, the RMS shall support

Page 54 - Page 54 of 278

AIMS Attachment A: AIMS Statement of Work Page 87 of 130 2. Planning: User shall only be able to make changes in the resource planning mode

Page 55 - Page 55 of 278

AIMS Attachment A: AIMS Statement of Work Page 88 of 130 iii Other specific requirements shall be defined by CONTRACTOR during the deve

Page 56 - Page 56 of 278

AIMS Attachment A: AIMS Statement of Work Page 89 of 130 hardware selected shall meet the operational, functional, and performance requirements

Page 57 - Page 57 of 278

AIMS System and Services Agreement Page 15 of 60 (a) Contractor shall notify County in wr

Page 58 - Page 58 of 278

AIMS Attachment A: AIMS Statement of Work Page 90 of 130 3.9.3 Supporting Infrastructure A. Passive Infrastructure: Provide final equip

Page 59 - Page 59 of 278

AIMS Attachment A: AIMS Statement of Work Page 91 of 130 1. Interior controlled environment: 60°F to 100°F dry bulb and 20 to 90 percent rela

Page 60 - Page 60 of 278

AIMS Attachment A: AIMS Statement of Work Page 92 of 130 configuration is provided. RAID shall not be implemented via the operating

Page 61 - Page 61 of 278

AIMS Attachment A: AIMS Statement of Work Page 93 of 130 2. 4 GB DDR2 400 MHz RAM. Sufficient memory shall be provided to meet the maximum tr

Page 62 - 1 GENERAL

AIMS Attachment A: AIMS Statement of Work Page 94 of 130 11. Standard windows keyboard and USB 2-button wheel mouse E. Data Storage System 1.

Page 63 - Page 63 of 278

AIMS Attachment A: AIMS Statement of Work Page 95 of 130 5. The UPS shall be rack mountable in a standard 19 inch equipment rack/ca

Page 64 - Page 64 of 278

AIMS Attachment A: AIMS Statement of Work Page 96 of 130 4. 10/100 Mbps Ethernet card (auto-negotiating) 5. 64 MB PCI Video card 6. 48x CD-R

Page 65 - Page 65 of 278

AIMS Attachment A: AIMS Statement of Work Page 97 of 130 vii Thermal 1D/2D barcode printer viii Card reader (credit card or frequent flyer car

Page 66 - Page 66 of 278

AIMS Attachment A: AIMS Statement of Work Page 98 of 130 3. Graphics and text shall be displayed at up to 1024 x 768 pixels. 4. Workstation c

Page 67 - Page 67 of 278

AIMS Attachment A: AIMS Statement of Work Page 99 of 130 3. 16:9 aspect ratio 4. Viewing angle of 176 degrees 5. Contrast ratio of 600:1 6.

Page 68 - Page 68 of 278

AIMS System and Services Agreement Page 16 of 60 6.2.4 County shall pay Contractor with

Page 69 - Page 69 of 278

AIMS Attachment A: AIMS Statement of Work Page 100 of 130 3. The matrix panel shall consist of three-color options: Red, Green, and Amber (Yel

Page 70 - Page 70 of 278

AIMS Attachment A: AIMS Statement of Work Page 101 of 130 C. LED Display: 1. LED Dot Matrix/Pixel Array i The pixel matrix shall be cap

Page 71 - Page 71 of 278

AIMS Attachment A: AIMS Statement of Work Page 102 of 130 ii The LED display must be readable in all ambient light conditions including dir

Page 72 - Page 72 of 278

AIMS Attachment A: AIMS Statement of Work Page 103 of 130 4. All high voltage electrical components used within the display shall be UL listed

Page 73 - Page 73 of 278

AIMS Attachment A: AIMS Statement of Work Page 104 of 130 B. 2D Ticket Printer 1. A receipt style printer shall be provided that is

Page 74 - Page 74 of 278

AIMS Attachment A: AIMS Statement of Work Page 105 of 130 1. The supplied BGR shall read 2D bar code printed boarding documents and shall su

Page 75 - Page 75 of 278

AIMS Attachment A: AIMS Statement of Work Page 106 of 130 7. Include annual maintenance agreement 8. Cisco 3560 series device 3.10 SYSTEM A

Page 76 - Page 76 of 278

AIMS Attachment A: AIMS Statement of Work Page 107 of 130 B. The user interface shall, to the extent feasible, be web enabled to provi

Page 77 - Page 77 of 278

AIMS Attachment A: AIMS Statement of Work Page 108 of 130 1. The systems shall adhere to a Client / Server model. The end devices shall be th

Page 78 - Page 78 of 278

AIMS Attachment A: AIMS Statement of Work Page 109 of 130 iii Provide original data values upon query when updated transaction remains uncommi

Page 79 - 2 PROJECT REQUIREMENTS

AIMS System and Services Agreement Page 17 of 60 6.2.9 Payment will be made to Contracto

Page 80 - Page 80 of 278

AIMS Attachment A: AIMS Statement of Work Page 110 of 130 requested by the County. The database(s) shall be designed such that the addition o

Page 81 - Page 81 of 278

AIMS Attachment A: AIMS Statement of Work Page 111 of 130 3.10.5 Security, Performance and Management A. Security 1. Authorized users shall l

Page 82 - Page 82 of 278

AIMS Attachment A: AIMS Statement of Work Page 112 of 130 use a rolling window with a System Administrator configurable window (i.e., after d

Page 83 - Page 83 of 278

AIMS Attachment A: AIMS Statement of Work Page 113 of 130 system maintenance, the end device that requires the maintenance shall be brought dow

Page 84 - Page 84 of 278

AIMS Attachment A: AIMS Statement of Work Page 114 of 130 user inputs a database change and the affected display devices reflect the change. T

Page 85 - Page 85 of 278

AIMS Attachment A: AIMS Statement of Work Page 115 of 130 D. For any and all reports, including both "canned" reports and

Page 86 - Page 86 of 278

AIMS Attachment A: AIMS Statement of Work Page 116 of 130 3.11.3 EVIDS Reporting Requirements A. EVIDS Master Flight Database (MFD) Report. 1.

Page 87 - Page 87 of 278

AIMS Attachment A: AIMS Statement of Work Page 117 of 130 5. Aircraft type(s). 6. For the EVIDS AFD and HFD reports, the user shall be able t

Page 88 - Page 88 of 278

AIMS Attachment A: AIMS Statement of Work Page 118 of 130 3.11.6 Airport Operational Database Reports A. The initial reporting requirements of

Page 89 - Page 89 of 278

AIMS Attachment A: AIMS Statement of Work Page 119 of 130 4 IMPLEMENTATION 4.1 INSTALLATION REQUIREMENTS 4.1.1 General A. System installat

Page 90 - Page 90 of 278

AIMS System and Services Agreement Page 18 of 60 7.4 Contractor acknowledges that County

Page 91 - Page 91 of 278

AIMS Attachment A: AIMS Statement of Work Page 120 of 130 B. The CONTRACTOR shall install and inspect all hardware required in this specificat

Page 92 - Page 92 of 278

AIMS Attachment A: AIMS Statement of Work Page 121 of 130 5. Power supplies to be connected to the system and equipment have been verifi

Page 93 - Page 93 of 278

AIMS Attachment A: AIMS Statement of Work Page 122 of 130 C. The test procedures shall provide conformity to all specification require

Page 94 - Page 94 of 278

AIMS Attachment A: AIMS Statement of Work Page 123 of 130 1. Operator equipment associated with system. 2. End devices and displays associate

Page 95 - Page 95 of 278

AIMS Attachment A: AIMS Statement of Work Page 124 of 130 County. Compliance is at the sole discretion of the County. If the Cou

Page 96 - Page 96 of 278

AIMS Attachment A: AIMS Statement of Work Page 125 of 130 F. Recording: 1. Describe actual operational tests performed and equipment used and

Page 97 - Page 97 of 278

AIMS Attachment A: AIMS Statement of Work Page 126 of 130 3. Environmental conditions. 4. Authority activities in process. 5. Description of

Page 98 - Page 98 of 278

AIMS Attachment A: AIMS Statement of Work Page 127 of 130 ii CONTRACTOR to make no repairs during this phase unless authorized in writ

Page 99 - Page 99 of 278

AIMS Attachment A: AIMS Statement of Work Page 128 of 130 1. When requested by the County, CONTRACTOR shall extend monitoring period fo

Page 100 - Page 100 of 278

AIMS Attachment A: AIMS Statement of Work Page 129 of 130 C. Training shall be conducted by experienced personnel and supported by training ai

Page 101 - Page 101 of 278

AIMS System and Services Agreement Page 19 of 60 ARTICLE 9 WORK AUTHORIZATIONS 9.1 Autho

Page 102 - Page 102 of 278

AIMS Attachment A: AIMS Statement of Work Page 130 of 130 renovation, alteration, inspection, maintenance and service on each system an

Page 103 - 3 TECHNICAL REQUIREMENTS

EXHIBIT B GOODS AND SYSTEM HARDWARE Project No: RFP No. 20070514-0-AV-01 Project Title: AIMS: Airport Information Management System Facility Nam

Page 104 - Page 104 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 105 - Page 105 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 106 - Page 106 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 107 - Page 107 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 108 - Page 108 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 109 - Page 109 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 110 - Page 110 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 111 - Page 111 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 112 - Page 112 of 278

AIMS System and Services Agreement Page 2 of 60 WHEREAS, County is not acquiring the

Page 113 - Page 113 of 278

AIMS System and Services Agreement Page 20 of 60 9.1.2 With respect to any Services

Page 114 - Page 114 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 115 - Page 115 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 116 - Page 116 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 117 - Page 117 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 118 - Page 118 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 119 - Page 119 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 120 - Page 120 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 121 - Page 121 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 122 - Page 122 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 123 - Page 123 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 124 - Page 124 of 278

AIMS System and Services Agreement Page 21 of 60 compensation shall not exceed the am

Page 125 - Page 125 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 126 - Page 126 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 127 - Page 127 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 128 - Page 128 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 129 - Page 129 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 130 - Page 130 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 131 - Page 131 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 132 - Page 132 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 133 - Page 133 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 134 - Page 134 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 135 - Page 135 of 278

AIMS System and Services Agreement Page 22 of 60 9.1.5 If it appears during the progress

Page 136 - Page 136 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 137 - Page 137 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 138 - Page 138 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 139 - Page 139 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 140 - Page 140 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 141 - Page 141 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 142 - Page 142 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 143 - Page 143 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 144 - Page 144 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 145 - Page 145 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 146 - Page 146 of 278

AIMS System and Services Agreement Page 23 of 60 10.3 County reserves the right and optio

Page 147 - Page 147 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 148 - Page 148 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 149 - Page 149 of 278

Existing EVIDS Display Devices Inventory SheetExhibit B-1Location Ref. #Use Description Display Type Manufacturer Model # Displayed Data Protocol Cabl

Page 150 - Page 150 of 278

Exhibit 3 Page 233 of 278

Page 151 - Page 151 of 278

Exhibit 3 Page 234 of 278

Page 152 - Page 152 of 278

EXHIBIT D RATES AND FEES TO BE CHARGED BY CONTRACTOR / SUBCONTRACTORS Exhibit D – Rates and Fees charged by Contractor/Subcontractor

Page 153 - Page 153 of 278

EXHIBIT E MASTER PRICE LIST Exhibit E – Master Price List 1 of 2 Project No: RFP No. 20070514-0-AV-01 Project Title: AIMS: Airpor

Page 154 - Page 154 of 278

EXHIBIT E MASTER PRICE LIST Exhibit E – Master Price List 2 of 2 REF. # SYSTEM OR OPTIONS QTY TYPE OR UNIT UNIT COST EXTENDED COST

Page 155 - Page 155 of 278

Payment ScheduleExhibit F Sub-phaseDeliverable/Milestone Description Units Unit Cost Value Phase 0 Phase 1 Phase 2 Phase 3Optional Services0001Compl

Page 156 - Page 156 of 278

Payment ScheduleExhibit F Sub-phaseDeliverable/Milestone Description Units Unit Cost Value Phase 0 Phase 1 Phase 2 Phase 3Optional ServicesFt. Laude

Page 157 - Page 157 of 278

AIMS System and Services Agreement Page 24 of 60 is hereby acknowledged by Contractor, is

Page 158 - Page 158 of 278

Payment ScheduleExhibit F Sub-phaseDeliverable/Milestone Description Units Unit Cost Value Phase 0 Phase 1 Phase 2 Phase 3Optional ServicesFt. Laude

Page 159 - Page 159 of 278

EXHIBIT G KEY STAFF Project No: RFP No. 20070514-0-AV-01 Project Title: AIMS: Airport Information Management System Facility Name: Ft. Lauder

Page 160 - Page 160 of 278

Exhibit 3 Page 242 of 278

Page 161 - Page 161 of 278

Exhibit 3 Page 243 of 278

Page 162 - Page 162 of 278

EXHIBIT "I-1" Work Authorization No. ____ Under Contract Administrator's Authority Project Title: AIRPORT INFORMATION MANAGEMENT

Page 163 - Page 163 of 278

EXHIBIT "I-2" Work Authorization No. ____ Under Purchasing Director's Authority Project Title: AIRPORT INFORMATION MANAGEMENT SY

Page 164 - Page 164 of 278

EXHIBIT "I-3" Work Authorization No. ____ Under Board of County Commissioners' Authority Project Title: AIRPORT INFORMATION MA

Page 165 - Page 165 of 278

EXHIBIT J SCHEDULE OF SUBCONTRACTOR PARTICIPATION Project No: RFP No. 20070514-0-AV-01 Project Title: AIMS: Airport Information Management Sys

Page 166 - Page 166 of 278

Exhibit 3 Page 248 of 278

Page 167 - Page 167 of 278

Exhibit J-2 Exhibit 3 Page 249 of 278

Page 168 - Page 168 of 278

AIMS System and Services Agreement Page 25 of 60 CBE was a factor in the award of

Page 169 - Page 169 of 278

Exhibit J-2 Exhibit 3 Page 250 of 278

Page 170 - Page 170 of 278

Exhibit 3 Page 251 of 278

Page 171 - Page 171 of 278

Exhibit 3 Page 252 of 278

Page 172 - Page 172 of 278

To Owner: Date:Period To/From:RLI No.:Project Name:Work Authorization No.:Project Manager:Request for Payment No.:NTP Date:Vendor Code:Contract For: P

Page 173 - Page 173 of 278

Consultant Invoice NumberA B C D E F G H I J K L M N OCONSULTANT DESCRIPTION OF WORKSCHEDULED VALUE METHOD - LS or NTE WORK COMPLETED PREVIOUS APPLICA

Page 174 - Page 174 of 278

EXHIBIT L C:\Documents and Settings\bgreenberg\Desktop\AIMS To Date\CO Page 1 Template.doc Board of County Commissione

Page 175 - Page 175 of 278

Optional Services Category 1 Exhibit M Category 1Deliverable/Milestone Description Units Unit Cost Value1.01Configuration, testing, and preliminary ac

Page 176 - Page 176 of 278

Optional Services Category 1 Exhibit M Category 1Deliverable/Milestone Description Units Unit Cost ValueFt. Lauderdale-Hollywood International Airport

Page 177 - Page 177 of 278

Optional Services Category 1 Exhibit M Category 1Deliverable/Milestone Description Units Unit Cost ValueFt. Lauderdale-Hollywood International Airport

Page 178 - Page 178 of 278

EXHIBIT M Optional Services Categories Limit 1. Stage 2/3 DAPP CUSS Airlines $ 280,000 This category covers implementation of additional airline

Page 179 - 4 IMPLEMENTATION

AIMS System and Services Agreement Page 26 of 60 11.3 Nondisclosure by County shall not a

Page 180 - Page 180 of 278

1 Exhibit N Exhibit N 00710. FORM OF PERFORMANCE BOND BY THIS BOND, We _______________________________________, as Principal, here

Page 181 - Page 181 of 278

2 Exhibit N FORM OF PERFORMANCE BOND (Continued) a) Complete the project in accordance with the terms and conditions of the Contract Do

Page 182 - Page 182 of 278

3 Exhibit N FORM OF PERFORMANCE BOND (Continued) WITNESSES: __________________________________ (Name of Corporation) _________

Page 183 - Page 183 of 278

4 Exhibit N 00720. FORM OF PAYMENT BOND BY THIS BOND, We _______________________________________, as Principal, hereinafter called

Page 184 - Page 184 of 278

5 Exhibit N FORM OF PAYMENT BOND (Continued) c) No action for the labor, materials, or supplies may be instituted against Cont

Page 185 - Page 185 of 278

AIMS System and Services Agreement – Attachment I Page 1 of 4 ATTACHMENT I NONDISCRIMINATION REQUIREMENTS I

Page 186 - Page 186 of 278

AIMS System and Services Agreement – Attachment I Page 2 of 4 (e) Sanctions for Noncompliance. In the

Page 187 - Page 187 of 278

AIMS System and Services Agreement – Attachment I Page 3 of 4 Contractor shall use the premises in compliance

Page 188 - Page 188 of 278

AIMS System and Services Agreement – Attachment I Page 4 of 4 Contractor shall similarly require such affirma

Page 189 - Page 189 of 278

AIMS System and Services Agreement – Attachment II Page 1 of 9 ATTACHMENT II PROVISIONS PERTAINING TO AIR

Page 190 - Page 190 of 278

AIMS System and Services Agreement Page 27 of 60 12.2 There are three testing periods

Page 191 - GOODS AND SYSTEM HARDWARE

AIMS System and Services Agreement – Attachment II Page 2 of 9 responsible for the immediate reporting of al

Page 192 - Page 192 of 278

AIMS System and Services Agreement – Attachment II Page 3 of 9 2. PROHIBITED INTERESTS If this System Agre

Page 193 - Page 193 of 278

AIMS System and Services Agreement – Attachment II Page 4 of 9 pursuant to this System Agreement, or if any

Page 194 - Page 194 of 278

AIMS System and Services Agreement – Attachment II Page 5 of 9 is owned or controlled directly or indi

Page 195 - Page 195 of 278

AIMS System and Services Agreement – Attachment II Page 6 of 9 8. TERMINATION OF CONTRACT (ALL CONTRAC

Page 196 - Page 196 of 278

AIMS System and Services Agreement – Attachment II Page 7 of 9 10. RESTRICTIONS ON LOBBYING The Contracto

Page 197 - Page 197 of 278

AIMS System and Services Agreement – Attachment II Page 8 of 9 The Assistant Disadvantaged Business Ente

Page 198 - Page 198 of 278

AIMS System and Services Agreement – Attachment II Page 9 of 9 c. That, as a condition for the award

Page 199 - Page 199 of 278

AIMS System and Services Agreement – Attachment III Page 1 of 1 ATTACHMENT III OFFSHORE STATEMENT The Con

Page 200 - Page 200 of 278

AIMS System and Services Agreement Page 28 of 60 refund to County any and all monies

Page 201 - Page 201 of 278

AIMS System and Services Agreement Page 29 of 60 13.4 In the event a determination o

Page 202 - Page 202 of 278

AIMS System and Services Agreement Page 3 of 60 ARTICLE 1 PREAMBLE 1.1 Recitations. The

Page 203 - Page 203 of 278

AIMS System and Services Agreement Page 30 of 60 functional and technical designs, rou

Page 204 - Page 204 of 278

AIMS System and Services Agreement Page 31 of 60 the value of the change order or the calc

Page 205 - Page 205 of 278

AIMS System and Services Agreement Page 32 of 60 cost, Contractor shall submit an ini

Page 206 - Page 206 of 278

AIMS System and Services Agreement Page 33 of 60 16.9 No Damages for Delay. No claim for

Page 207 - Page 207 of 278

AIMS System and Services Agreement Page 34 of 60 by Contractor or its subcontractors,

Page 208 - Page 208 of 278

AIMS System and Services Agreement Page 35 of 60 17.1.3 Contractor shall comply with Titl

Page 209 - Page 209 of 278

AIMS System and Services Agreement Page 36 of 60 contracting opportunities. Contractor agr

Page 210 - Page 210 of 278

AIMS System and Services Agreement Page 37 of 60 Contractor agrees to furnish an upda

Page 211 - Page 211 of 278

AIMS System and Services Agreement Page 38 of 60 (c) Nothing under this Section 17.2

Page 212 - Page 212 of 278

AIMS System and Services Agreement Page 39 of 60 System Agreement and that County’s Contra

Page 213 - Page 213 of 278

AIMS System and Services Agreement Page 4 of 60 2.7 Contract Administrator: means the

Page 214 - Page 214 of 278

AIMS System and Services Agreement Page 40 of 60 Liability and Five Million Dollars (

Page 215 - Page 215 of 278

AIMS System and Services Agreement Page 41 of 60 18.5 Additional Insured. Contractor agre

Page 216 - Page 216 of 278

AIMS System and Services Agreement Page 42 of 60 agency, and the sponsor of any gran

Page 217 - Page 217 of 278

AIMS System and Services Agreement Page 43 of 60 the project is subject to Florida Departm

Page 218 - Page 218 of 278

AIMS System and Services Agreement Page 44 of 60 liability at its discretion, to deduct fr

Page 219 - Page 219 of 278

AIMS System and Services Agreement Page 45 of 60 Management Division may either (i) accept

Page 220 - Page 220 of 278

AIMS System and Services Agreement Page 46 of 60 20.8.2 Contractor, its subcontractors

Page 221 - Page 221 of 278

AIMS System and Services Agreement Page 47 of 60 20.9.2 No modification, amendment or

Page 222 - Page 222 of 278

AIMS System and Services Agreement Page 48 of 60 20.13 Drug-Free Workplace. It is a requ

Page 223 - Page 223 of 278

AIMS System and Services Agreement Page 49 of 60 20.17 Taxes. Contractor acknowledges tha

Page 224 - Page 224 of 278

AIMS System and Services Agreement Page 5 of 60 2.15 Defects: means incorrect implementa

Page 225 - Page 225 of 278

AIMS System and Services Agreement Page 50 of 60 BROWARD COUNTY With a copy to: Dire

Page 226 - Page 226 of 278

AIMS System and Services Agreement Page 51 of 60 20.23 Priority of Provisions. If there

Page 227 - Page 227 of 278

AIMS System and Services Agreement Page 52 of 60 20.25 Compliance with Laws. Throughou

Page 228 - Page 228 of 278

AIMS System and Services Agreement Page 53 of 60 and/or press releases, and, may not

Page 229 - Page 229 of 278

AIMS System and Services Agreement Page 54 of 60 operating and Checkpoint VPN client Softw

Page 230 - Page 230 of 278

AIMS System and Services Agreement Page 55 of 60 Aviation Department. The Contractor

Page 231 - Page 231 of 278

AIMS System and Services Agreement Page 56 of 60 supplement, modification or amendment

Page 232 - Page 232 of 278

AIMS System and Services Agreement Page 57 of 60 a component of Goods shall be deemed lice

Page 233 - Page 233 of 278

AIMS System and Services Agreement Page 58 of 60 Term under Section 8.2 of the License Agr

Page 234 - Page 234 of 278

Exhibit 3 Page 59 of 278

Page 235 - LABOR RATES

AIMS System and Services Agreement Page 6 of 60 Priority 4 - Minimal Business Impact Eve

Page 236 - MASTER PRICE LIST

Exhibit 3 Page 60 of 278

Page 237

EXHIBIT A IMPLEMENTATION STATEMENT OF WORK Exhibit 3 Page 61 of 278

Page 238 - Exhibit F

AIMS Attachment A: AIMS Statement of Work Page 2 of 130 1 GENERAL The following constitutes the Statement of Work for this Contract.

Page 239

AIMS Attachment A: AIMS Statement of Work Page 3 of 130 LAN utilizing IP based protocols. The Multi-Use LAN shall support all syste

Page 240

AIMS Attachment A: AIMS Statement of Work Page 4 of 130 Thorough review, analysis, and acceptance of existing systems, software, and componen

Page 241 - Page 241 of 278

AIMS Attachment A: AIMS Statement of Work Page 5 of 130 The CONTRACTOR shall be responsible for close coordination with the County‟s staff to

Page 242 - Page 242 of 278

AIMS Attachment A: AIMS Statement of Work Page 6 of 130 The CONTRACTOR shall provide and pay for all labor, materials, and equipment.

Page 243 - Page 243 of 278

AIMS Attachment A: AIMS Statement of Work Page 7 of 130 System testing and acceptance plans as specified. Acceptance of existing condi

Page 244 - Page 244 of 278

AIMS Attachment A: AIMS Statement of Work Page 8 of 130 Secure and pay for plan check fees, permits, fees, and licenses necessary for the exe

Page 245 - Page 245 of 278

AIMS Attachment A: AIMS Statement of Work Page 9 of 130 EVIDS) and integrated to ensure that displayed information is current. In addition, t

Page 246 - Page 246 of 278

AIMS System and Services Agreement Page 7 of 60 2.26 Maintenance Services: means any

Page 247 - Page 247 of 278

AIMS Attachment A: AIMS Statement of Work Page 10 of 130 ii Screen formats and displayed information workshops (all displays) iii Tenant Gat

Page 248 - Page 248 of 278

AIMS Attachment A: AIMS Statement of Work Page 11 of 130 not commence until the testing procedure has been submitted and approved by

Page 249 - Exhibit J-2

AIMS Attachment A: AIMS Statement of Work Page 12 of 130 1.6.2 Phase One Item # Deliverable Acceptance Criteria 101 Provide Submittals associ

Page 250

AIMS Attachment A: AIMS Statement of Work Page 13 of 130 Acceptance 103 Complete head-end equipment installation (hardware and operating sys

Page 251 - Page 251 of 278

AIMS Attachment A: AIMS Statement of Work Page 14 of 130 documents 202 Existing EVIDS in Terminal One cut over to new system. Field Verificati

Page 252 - Page 252 of 278

AIMS Attachment A: AIMS Statement of Work Page 15 of 130 field verification 215 Complete installation of all stage two DAPP airlines, if

Page 253 - EXHIBIT K

AIMS Attachment A: AIMS Statement of Work Page 16 of 130 AIMS 24 hours 7 days a week throughout testing periods 307.4 Maintain a conti

Page 254 - Page 254 of 278

AIMS Attachment A: AIMS Statement of Work Page 17 of 130 Air Jamaica T4 Stage 1B Allegiant Stage 2 (Optional Service) Frontier Stage 2 (Opt

Page 255 - Page 255 of 278

AIMS Attachment A: AIMS Statement of Work Page 18 of 130 Air Jamaica Stage 2 (Optional Service) Air Transat Stage 2 (Optional Service) Avianca

Page 256 - Exhibit M

AIMS Attachment A: AIMS Statement of Work Page 19 of 130 2 PROJECT REQUIREMENTS 2.1 PROJECT MANAGEMENT 2.1.1 Project Management Requirement

Page 257

AIMS System and Services Agreement Page 8 of 60 Documents and under any exhibit there

Page 258

AIMS Attachment A: AIMS Statement of Work Page 20 of 130 detailed charts maybe required to accurately convey the flow of information/w

Page 259 - Categories

AIMS Attachment A: AIMS Statement of Work Page 21 of 130 1. CONTRACTOR shall provide a project directory/contact list, which is a detailed dir

Page 260 - Exhibit N

AIMS Attachment A: AIMS Statement of Work Page 22 of 130 B. The schedule shall identify activities, scheduling, and show relationships between

Page 261

AIMS Attachment A: AIMS Statement of Work Page 23 of 130 temperatures, precipitation and/or saturated soil conditions, to ensure completion of

Page 262

AIMS Attachment A: AIMS Statement of Work Page 24 of 130 2. Within fifteen (15) calendar days of notification of an initiating event w

Page 263

AIMS Attachment A: AIMS Statement of Work Page 25 of 130 The CONTRACTOR must keep accurate and detailed computerized/written records of p

Page 264

AIMS Attachment A: AIMS Statement of Work Page 26 of 130 5. Reporting Accidents: Prepare and submit reports of any significant accid

Page 265 - Page 265 of 278

AIMS Attachment A: AIMS Statement of Work Page 27 of 130 Summary Reports to the County. These reports shall address both project progr

Page 266 - Page 266 of 278

AIMS Attachment A: AIMS Statement of Work Page 28 of 130 9. Punch-List: The CONTRACTOR shall maintain a continuous log, or “rolling punch

Page 267 - Page 267 of 278

AIMS Attachment A: AIMS Statement of Work Page 29 of 130 6. The following submittals shall be provided by the CONTRACTOR at the Pre-Impl

Page 268 - Page 268 of 278

AIMS System and Services Agreement Page 9 of 60 Exhibit A Statement of Work Exhibit

Page 269 - Page 269 of 278

AIMS Attachment A: AIMS Statement of Work Page 30 of 130 Work as requiring testing, and inspection or which has code-required special inspectio

Page 270 - Page 270 of 278

AIMS Attachment A: AIMS Statement of Work Page 31 of 130 recognized. Issue the revised schedule concurrently with the minutes of each Progress

Page 271 - Page 271 of 278

AIMS Attachment A: AIMS Statement of Work Page 32 of 130 CONTRACTOR shall terminate use and remove facilities at earliest reasonable ti

Page 272 - Page 272 of 278

AIMS Attachment A: AIMS Statement of Work Page 33 of 130 combustible or not, shall be discarded in covered metal containers daily and removed f

Page 273 - Page 273 of 278

AIMS Attachment A: AIMS Statement of Work Page 34 of 130 substitution shall result in a product that in every significant respect is

Page 274 - Page 274 of 278

AIMS Attachment A: AIMS Statement of Work Page 35 of 130 2.3.2 Description of Quality Control Program A. CONTRACTOR shall provide full an

Page 275 - Page 275 of 278

AIMS Attachment A: AIMS Statement of Work Page 36 of 130 be attended by the personnel who will perform the work and a representative

Page 276 - Page 276 of 278

AIMS Attachment A: AIMS Statement of Work Page 37 of 130 B. Inspection - Methods of performing quality control inspections including t

Page 277 - Page 277 of 278

AIMS Attachment A: AIMS Statement of Work Page 38 of 130 2.3.5 Quality Control Procedures - This is a detailed description of quality control

Page 278 - Page 278 of 278

AIMS Attachment A: AIMS Statement of Work Page 39 of 130 C. Provided Goods shall meet the following requirements: 1. Electrically powered Equ

Commentaires sur ces manuels

Pas de commentaire